Jump to content


Search the Community

Showing results for tags 'SCCM 2012 R2 migration'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Cloud
    • Azure
    • Microsoft Intune
    • Office 365
    • Windows 365
  • General Stuff
    • General Chat
    • Events
    • Site News
    • Official Forum Supporters
    • Windows News
    • Suggestion box
    • Jobs
  • MDT, SMS, SCCM, Current Branch &Technical Preview
    • How do I ?
    • Microsoft Deployment Toolkit (MDT)
    • SMS 2003
    • Configuration Manager 2007
    • Configuration Manager 2012
    • System Center Configuration Manager (Current Branch)
    • Packaging
    • scripting
    • Endpoint Protection
  • Windows Client
    • how do I ?
    • Windows 10
    • Windows 8
    • Windows 7
    • Windows Vista
    • Windows XP
    • windows screenshots
  • Windows Server
    • Windows Server General
    • Active Directory
    • Microsoft SQL Server
    • System Center Operations Manager
    • KMS
    • Windows Deployment Services
    • NAP
    • Failover Clustering
    • PKI
    • Hyper V
    • Exchange
    • IIS/apache/web server
    • System Center Data Protection Manager
    • System Center Service Manager
    • System Center App Controller
    • System Center Virtual Machine Manager
    • System Center Orchestrator
    • Lync
    • Application Virtualization
    • Sharepoint
    • WSUS

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Location


Interests

Found 1 result

  1. Hi Team, We have an existing hirerachy of SCCM 2012 R2 and would like to move that hierarchy to another datacenter. as per the IT mandates, we have to use the different nomenclature in the new DC. We have 1 CAS Server, 2 primary sites (abc and xyz) a nd 1 secondary sites. SQL 2012 R2 is also need to be migrated to the new datacenter. CAS and abc Primary site exists in old datacenter, and xyz primary site existing in the new datacenter complying to the new datacenter nomenclature. The secondary site located in a remote location is connected to the abc primary site. as per the approach, we are planning to the build new CAS and abc primary site using 2012 r2 migration tool to migrate the hierarchy to the new hierarchy. Since the xyz primary site already exist in the new datacenter, I am hoping to just repoint the xyz primary site to the new CAS server. I would like to know if I can re point the secondary server to the new primary server keeping the secondary site code same and point it to the new primary site code. your help is highly appreciated.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.