Jump to content


lalajee

Distribution Point Job queue Manger show 86 jobs running for last 5 days

Recommended Posts

Hi, 

Under the Distribution Point Job queue Manger it show that 86 jobs are running for last 5 days.

 

I have checked Distmgr, PKGXfermgr log on primary server and SMSDPPRov log on DP but I dont see any issue. The DP which is showing 86 package running is Pull DP

Our Setup

  • CAS with 3 Primary Site With DP and Pull DP

image.thumb.png.703950a4dce5fdaad83b3e5356bd13f3.png

My question is

  • Does it mean 86 Jobs are replicating to this server or is this server replicating 86 Job to other DP's
  • What logs i can check to see why it has 86 Job running for last 5 days.
  • Which server do I need check the logs from

Please advice

 

image.png

Share this post


Link to post
Share on other sites

have you tried looking at your distribution point configuration status in Monitoring ? what does that tell you

also, why do you have a CAS and three primaries, are you managing 150,000 clients (or more) ?

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...


×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.