I need to migrate my SCCM 2007 R2 Central Server (running on Windows 2008 Standard x64) to a new Win2008 R2 Server. I have version 4.00.6221.1000. It is parent to two child Primary sites (on Windows 2008 Std x64). The existing server is having issues but is still up and running. I also want to install SP2 in readiness for Windows 7/2008R2 deployment
The SQL database it is pointing to is staying the same. Has about 2000 clients and in a single 2003 domain
The Central Server has collections, boundries, packages, OSD's and advertisments. It is also the FSP / MP / SUP and Reporting point. However all clients point to either of the Primary Child sites as MP's depending on their location ie UK or France - and the Central is the fallback.
I have read a couple of other posts on this scenario and want to list my steps and get your expert assessment/opinions please.
Instead of doing a complicated side-by-side migration, can I do the following backup and restore?
1.do a full backup under Site Mantenenace / Tasks of the Central Server
2.Rename Windows Server holding the Central Site Server (should I do anything in SCCM itself) - or even just shut it down
3.Build new (windows 2008 R2) windows server with old central server windows name (new IP address) - What about the SCCM Site name - obviouly must stay the same?
4.Install vanilla SCCM - follow your guide for example (I used your guide to build the original servers :-))
5.Perform restore from splash.hta or DVD
6.This won't import packages and I will have to redo the Roles
this sound OK?
then I install SP2 on the new central and then the child primary's.
We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.
Hi all,
I need to migrate my SCCM 2007 R2 Central Server (running on Windows 2008 Standard x64) to a new Win2008 R2 Server. I have version 4.00.6221.1000. It is parent to two child Primary sites (on Windows 2008 Std x64). The existing server is having issues but is still up and running. I also want to install SP2 in readiness for Windows 7/2008R2 deployment
The SQL database it is pointing to is staying the same. Has about 2000 clients and in a single 2003 domain
The Central Server has collections, boundries, packages, OSD's and advertisments. It is also the FSP / MP / SUP and Reporting point. However all clients point to either of the Primary Child sites as MP's depending on their location ie UK or France - and the Central is the fallback.
I have read a couple of other posts on this scenario and want to list my steps and get your expert assessment/opinions please.
Instead of doing a complicated side-by-side migration, can I do the following backup and restore?
1.do a full backup under Site Mantenenace / Tasks of the Central Server
2.Rename Windows Server holding the Central Site Server (should I do anything in SCCM itself) - or even just shut it down
3.Build new (windows 2008 R2) windows server with old central server windows name (new IP address) - What about the SCCM Site name - obviouly must stay the same?
4.Install vanilla SCCM - follow your guide for example (I used your guide to build the original servers :-))
5.Perform restore from splash.hta or DVD
6.This won't import packages and I will have to redo the Roles
this sound OK?
then I install SP2 on the new central and then the child primary's.
Many Thanks for helping