Jump to content


  • 0
MarcoX

Deploying Windows 2008 R2 on C:/

Question

Hello everybody :) ,

 

i'm experiencing a strange trouble about deploying a RETAIL .wim of Windows Server 2008 R2 (i mean the .win on sources Retail DVD, not a captured image).

 

Indeed i just want to do a standard server task sequence (not an MDT one) via SCCM 2007 R3, and after deploying OS, my System is installed on D:/ and not C:/ as usual

Only one partition, the bootable one + SYstem.

 

I don't understand why my system is installed on D:/ and not C:/ since it's the only one partition available..

 

I tried to create 2 partition in my task sequence the bootable one , and the other for the system..i got same probleme.

I tried to use Varialble to force to install on C:/ ...Same probleme..

 

well i must miss something, i don't got this trouble with other OS deployment ..

 

 

Well, i would like to have The First partition bootable (with boot.mgr) hidden with no letter and My IOS (WS2008R2) on C:/ ... this is the best way.

 

do you have the tips to do it with WS2008R2 ?

 

 

Here is my (very simple) TS that dosent work :

 

screen01tj.jpg

 

screen02dm.jpg

 

 

 

 

Some idea ? some users got same prob ?

 

Regards, :)

 

Marc.

Share this post


Link to post
Share on other sites

4 answers to this question

Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Answer this question...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...


×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.