Damien Posted December 21, 2011 Report post Posted December 21, 2011 Hi Guys, We have 3 remote site servers, and I was wondering if there is a way to schedule the DP updates, so the DPs would update after work hours. The reason is we have a slow link to those servers and don’t want to use the whole bandwidth for the Site servers during work hours. Thanks in advance. Quote Share this post Link to post Share on other sites More sharing options...
0 wmmayms Posted December 21, 2011 Report post Posted December 21, 2011 Yes there is a way, reconfigure them as secondary sites Quote Share this post Link to post Share on other sites More sharing options...
0 Damien Posted December 21, 2011 Report post Posted December 21, 2011 can you please explain how I can do this? Thank you. Quote Share this post Link to post Share on other sites More sharing options...
0 wmmayms Posted December 22, 2011 Report post Posted December 22, 2011 Here is a guide on how to setup a secondary site: http://technet.microsoft.com/en-us/library/bb633289.aspx Quote Share this post Link to post Share on other sites More sharing options...
Hi Guys,
We have 3 remote site servers, and I was wondering if there is a way to schedule the DP updates, so the DPs would update after work hours.
The reason is we have a slow link to those servers and don’t want to use the whole bandwidth for the Site servers during work hours.
Thanks in advance.
Share this post
Link to post
Share on other sites