greywolf238 Posted April 12, 2013 Report post Posted April 12, 2013 Hi guys, I’m getting ready to roll out Office 2010 to about 500 users spread between 5 floors all in the same building. The server and all desktop pc’s are in the same building. My question is what is the best practice at pushing this out? How many users should I do at once without choking the network ? Should I do a mandatory push or just do an Advertisement and let the users do it at their convenience ? Only the SCCM server is a DP right now. Thanks All Quote Share this post Link to post Share on other sites More sharing options...
Rocket Man Posted April 14, 2013 Report post Posted April 14, 2013 Have you different departmental user groups? If so probably best to deploy it to these user collections as available over a period of time and then keep track in the deployment monitoring to see if they have installed it. Let them browse the application catalog for it. OR Use WOL at non-peak and schedule the deployment to the appropriate systems collections. Quote Share this post Link to post Share on other sites More sharing options...
greywolf238 Posted April 16, 2013 Report post Posted April 16, 2013 We don't have different dept. user groups setup, there's 5 floors of users and each floor is a separate OU. Like you said, I will probably deploy 1 floor at a time off hours. Quote Share this post Link to post Share on other sites More sharing options...