nucleartool Posted May 21, 2013 Report post Posted May 21, 2013 Hi guys,, New member here. Sorry if this has been asked before but it is confusing me. I believe that SCCM 2012 can co-exist with 2007 and use existing 2007 DP content during the 2012 system buildup/rollout. So, assuming that works fine, how difficult or advisable is it to keep using existing 2007 secondary sites (only have MP/DP/PXE roles) during migration and then turn them into 2012 DP's when ready to flip completely to 2012? Main goal is to avoid staging new hardware and storage at each site. We will simply get it back once we decomission the exiting 2007 secondary sites anyway. Seems pointless. We have 2 Primary sites and around 10 secondary sites in our current setup, all running at least Windows 2008. Thanks a lot! Quote Share this post Link to post Share on other sites More sharing options...